Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("DEMARRAGE RAPIDE")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 31

  • Page / 2
Export

Selection :

  • and

EXPERIMENTS ON PEAK PERIOD START-UP FOR 28 H. (SATURDAY TO MONDAY) OF A 50 MW CONDENSATION POWER PLANT UNITPOP MG; AMARIUTEI P.1975; ENERGETICA; ROMAN.; DA. 1975; VOL. 23; NO 9-10; PP. 238-243; ABS. RUSSE ALLEM. FR. ANGL.; BIBL. 6 REF.Article

INFLUENCE DE L'ERREUR DE DETERMINATION DES CONDITIONS LIMITES DE L'ECHANGEUR THERMIQUE SUR LES CONTRAINTES THERMIQUES DANS LES AUBAGES DES TURBINES A GAZ LORS DE DEMARRAGES BRUTAUXTRUKHNIJ AD.1972; TRUDY MOSKOV. ENERGET. INST.; S.S.S.R.; DA. 1972; NO 99; PP. 129-135; BIBL. 3 REF.Serial Issue

SCHNELL-START = QUICK START UP = MISE EN ROUTE RAPIDE1981; ENERGIE (MUENCHEN); ISSN 0013-7359; DEU; DA. 1981; VOL. 33; NO 11; PP. 388-389Article

SCHENELLSTAZT VON GASTURBINEN MIT HILFE VON VGD-LUFTSPEICHERN. = RAPID STARTING OF GAS TURBINES WITH THE HELP OF PRESTRESSED CAST-IRON AIR STORAGE TANKS = MISE EN MARCHE RAPIDE DES TURBINES A GAZ A L'AIDE D'ACCUMULATEURS D'AIR SOUS PRESSION EN FONTE PRECONTRAINTE VGD)GILLI PV; BECKMANN G.1976; ELEKTRIZITAETSWIRTSCHAFT; DTSCH.; DA. 1976; VOL. 75; NO 6; PP. 116-118; ABS. ANGL.; BIBL. 12 REF.Article

DIMENSIONNEMENT ET CONCEPTION DU SYSTEME DE BY-PASS BASSE PRESSION = SIZING AND DESIGN OF LOW PRESSURE BY PASS SYSTEMSNABHOLZ U.1978; REV. BROWN BOVERI; CHE; DA. 1978; VOL. 65; NO 8; PP. 541-545; BIBL. 6 REF.Article

AUF VOLLEN TAUREN-LEITTECHNIK FUER GASTURBOSAETZE = AT FULL RATE. CONTROL TECHNIQUE FOR GAS TURBINE = A PLEIN REGIME. TECHNIQUE DE COMMANDE POUR TURBINES A GAZ.1981; ENERGIE (MUENCH.); ISSN 0013-7359; DEU; DA. 1981; VOL. 33; NO 8-9; PP. 309-311; BIBL. 7 REF.Article

ERMITTLUNG DER ZULAESSIGEN ANFAHRGESCHWINDIGKEIT EINES SCHNELLSTARTKESSELS MIT HILFE EINES BERECHNUNGSVERFAHRENS ZUR ERMITTLUNG VON ZEITLICHEN TEMPERATURVERLAEUFEN IN DICKWANDIGEN BAUTEILEN. = DETERMINATION OF THE ADMISSIBLE STARTING SPEED OF A RAPID STARTING BOILER BY THE CALCULATION OF STRUCTURAL WALL TEMPERATURE VARIATION = DETERMINATION DE LA VITESSE ADMISSIBLE DE MISE EN ROUTE D'UNE CHAUDIERE A DEMARRAGE RAPIDE A L'AIDE D'UNE METHODE DE CALCUL DES VARIATIONS DE LA TEMPERATURE DANS DES ELEMENTS DE CONSTRUCTION A PAROIS EPAISSESBAUMULLER F; LETTOW W; SEYBOLD M et al.1978; V.G.B. KRAFTWERKSTECH.; DTSCH.; DA. 1978; VOL. 58; NO 4; PP. 298-303; ABS. DAN. ITAL. RUSSE; BIBL. 8 REF.Article

EVALUATION OF A DRUM-BOILER SUPERHEATER TEMPERATURE IN THE CASE OF FAST STARTUPTUGOV AI; MOSEEV GI.1979; TEPLOENERGETIKA; SUN; DA. 1979; NO 4; PP. 21-25; BIBL. 8 REF.Article

SCHNELLER START DURCH AUTOMATIK = DEMARRAGE PLUS RAPIDE PAR L'AUTOMATISMEHAMM D; KOERNER M; WUEST R et al.1979; ENERGIE; DEU; DA. 1979; VOL. 31; NO 3; PP. 87-90; BIBL. 6 REF.Article

FAST START EMERGENCY POWER PLANT FOR INDUSTRIAL APPLICATION = PRODUCTION D'ENERGIE DE SECOURS A GRANDE RAPIDITE D'INTERVENTION POUR APPLICATIONS INDUSTRIELLESPELZER H.1972; IN: 3RD EUR. STATE ART CONGR. COSTA DO SOL, PORT., 1972; SCHENECTADY, N.Y.; GENERAL ELECTRIC CO.; DA. 1972; VOL. 7202; PP. 1-4Conference Paper

IHI-FW VARIABLE PRESSURE OPERATION SUPERCRITICAL ONCE-THROUGH STEAM GENERATOR1978; ISHIKAWAJIMA-HARIMA ENGNG REV.; JAP.; DA. 1978; VOL. 18; NO 2; PP. 188-197; ABS. ANGL.Article

OPTIMALE KONZEPTION IM INDUSTRIEKESSELBAU = OPTIMAL DESIGN OF INDUSTRIAL BOILERS = CONCEPTION OPTIMALE DANS LA CONSTRUCTION DES CHAUDIERES INDUSTRIELLESENGELS H.1979; BRENNST. WAERME KRAFT; DEU; DA. 1979; VOL. 31; NO 1; PP. 7-17; ABS. ENGArticle

BETRIEBSERFAHRUNGEN MIT DEM ELEKTRONISCHEN STEUERUNGSSYSTEM GEAMATIC 1150 EINES VOLLAUTOMATISCHEN 150-MW-SCHNELLSTARTDAMPFBLOCKES. = OPERATING EXPERIENCE WITH AN ELECTRONIC CONTROL SYSTEM (GEAMATIC 1150) FOR A FAST STARTING 150 MW POWER PLANT UNIT = EXPERIENCE D'EXPLOITATION DU SYSTEME DE COMMANDE ELECTRONIQUE GEAMATIC 1150 D'UNE UNITE AUTOMATIQUE DE 150 MW A DEMARRAGE RAPIDEVON PRONDZINSKI H.1976; ELEKTRIZITAETSWIRTSCHAFT; DTSCH.; DA. 1976; VOL. 75; NO 24; PP. 926-930; BIBL. 4 REF.Article

Optimierung dickwandiger Kesselbauteile im Hinblick auf kurze An- and Abfahrzeiten = Optimisation des composantes d'une chaudière à parois épaisses en relation avec des temps de démarrage et de fermeture courts = Optimization of thick wall boiler components in relation with short start-up and shutdown timesHANEKE, R; SPEITKAMP, L.VGB Kraftwerkstechnik. 1987, Vol 67, Num 9, pp 858-862, issn 0372-5715Article

Hydrodynamic simulation for off-center fast ignition modelMAHDY, A. I; SUNAHARA, A; TAKABE, H et al.Fusion engineering and design. 1999, Vol 44, pp 255-259, issn 0920-3796Conference Paper

Some improvements of starting characteristics of magnetic gear by eddy current effectTSURUMOTO, K.IEEE translation journal on magnetics in Japan. 1993, Vol 8, Num 1, pp 62-66, issn 0882-4959Article

Transient drop deformation upon startup of shear in viscoelastic fluidsPENGTAO YUE; FENG, James J; CHUN LIU et al.Physics of fluids (1994). 2005, Vol 17, Num 12, pp 123101.1-123101.6, issn 1070-6631Article

30-TW laser-plasma interactions at ILE, OsakaKITAGAWA, Y; KODAMA, R; FUJITA, H et al.Fusion engineering and design. 1999, Vol 44, pp 261-265, issn 0920-3796Conference Paper

Ultrahigh-brightness KrF laser system for fast ignition studiesSHAW, M. J; ROSS, I. N; WYBORN, B. E et al.Fusion engineering and design. 1999, Vol 44, pp 209-214, issn 0920-3796Conference Paper

The preservation and starting from cold of large oil-fired generating plantLANG, A; SENIOR, C. H.Proceedings of the Institution of Mechanical Engineers. Part A. Power and process engineering. 1984, Vol 198, Num 5, pp 71-79, issn 0263-7138Article

Experience with a (pilot) rising film plate evaporator and new mist eliminator in LouisianaKAMPEN, W. H; MONGE, A; ENGOLIO, J et al.International sugar journal. 1999, Vol 101, Num 1210, pp 523-526, issn 0020-8841, 3 p.Article

Beam matter interaction physics for fast ignitorsBOREHAM, B. W; BOLTON, P. R; KASOTAKIS, G et al.Fusion engineering and design. 1999, Vol 44, pp 215-224, issn 0920-3796Conference Paper

You've Got Ten MinutesBLANKINSHIP, Steve.Power engineering (Barrington, IL.). 2008, Vol 112, Num 8, issn 0032-5961, 38-42 [3 p.]Article

A gasoline fuel processor designed to study quick-start performanceAHMED, S; AHLUWALIA, R; LEE, S. H. D et al.Journal of power sources. 2006, Vol 154, Num 1, pp 214-222, issn 0378-7753, 9 p.Article

Low-noise microwave oven magnetrons with fast start-oscillation by azimuthally varying axial magnetic fieldsBOGDAN NECULAES, V; GILGENBACH, Ronald M; YUE YING LAU et al.IEEE transactions on plasma science. 2004, Vol 32, Num 3, pp 1152-1159, issn 0093-3813, 8 p., 1Article

  • Page / 2